Industrial
PepsiCo Greenfield Project
At a Glance
Location
Nongkhae Industrial Estate, Saraburi
Country
Thailand
Client
International Refreshment (Thailand) Co., Ltd.
Architect
Design Management Insight Co., Ltd.
Services Provided
Lead Project Consultant (Civil, Structural, Mechanical, Electrical and Sanitary Engineering Design), LEED Project Administration, Energy Simulation, Commissioning Authority, Project Management, Construction Management, Full Time Site Construction Supervision
Awards
-
The project is located in the 100-Rai greenfield site in Nongkhae Industrial Estate, Saraburi. The total construction area of Phase 1 excluding water trank, pump room, WWTP and external waste storage Building is about 28,000 sqm, approximately. There will be the expansion in the future with the total construction area of 80,000 sqm, approximately.
The project comprises of the main manufacturing building (sugar and raw ingredient warehouse, mixing and filling process area, packaging area, packaging material warehouse, finish good warehouse) office building, utility & facility building.
The project is designed and constructed following the FM Global requirements. The project building targets to achieve LEED Silver certification.